When the house is finished, it goes to the outside area. This is how many think - and are wrong! No matter whether paving or gardening - for good reasons you should start planning the outdoor areas earlier.

Table of contents Table of contents Outdoor facilities in house construction: what is due and when?

  • Tips for planning the outdoor facilities
  • What is part of the outdoor facilities?
  • Start early with earthwork for the outdoor facilities
  • The design of the garden
  • Outdoor facilities costs

Table of contents Table of contents Outdoor facilities in house construction: what is due and when?

  • Tips for planning the outdoor facilities
  • What is part of the outdoor facilities?
  • Start early with earthwork for the outdoor facilities
  • The design of the garden
  • Outdoor facilities costs

Only when the house is finished do many builders think about the outdoor facilities. This is not a problem for beds and lawns, but the rough planning should be completed before building the house - otherwise there is a risk that you will miss opportunities.

Above all, some paving work such as the driveway or the way to the house should be so advanced when moving in that a compacted ballast base layer is available as a substructure. On the one hand, the moving van can be safely parked on it without sinking into the ground. On the other hand, the risk of accidents is high if you have to carry all the furniture into the house with wobbly building boards. However, the practical implementation of garden design can only begin when the house is finished. Because as long as there are still building materials everywhere, rubble has not yet been disposed of, the gravel mountains from the screed layer or delivery trucks block the way, the concrete garden design is a long way off. In addition, you should deeply loosen the soil on the entire property before you start planting. As long as construction machinery is still on the property, of course, this is pointless.

Tips for planning the outdoor facilities

While you are still planning your house construction, important questions for the outdoor facilities should already be clarified and shown in the site plan. This affects mainly paved areas and outbuildings such as garages, carports or garden houses, since you usually also need a building permit. You must submit the site plan with the most concrete possible presentation of the land design with the building application. So consider early on where paths, property access, fences, garage and terrace should be and how the rough division of the property into lawns and beds should be done. Paving surfaces and paths to the house can no longer be changed so easily afterwards.

What is part of the outdoor facilities?

Many equate the outdoor facilities of a property with the garden. This is not entirely true, because in addition to lawn, trees, privacy screens and beds, the term also includes the necessary excavation work as well as drainage pipes and drainage shafts on the property. Structural interventions such as paving, fences, walls, garden shed, rainwater cisterns and the garage are part of the outdoor area.

Terrasse anlegen
Terrasse anlegen

So that the terrace is solid, the ground must be straightened beforehand.

Photo: Flora Press / FocusOnGarden / Jürgen Becker

Plan the carport and garage at the same time

The carport or garage can be free-standing or connected to the house; they are built in solid or lightweight construction from stone, concrete, sheet steel or wood. Many providers have or carport kits in the program. Let the architect help you plan a garage or a carport as well as possible terrace roofing. Then the choice of materials and the chosen location are right and this goes right through with that for the house - even if you might want to build the garage in a year or two for cost reasons. You should definitely have the foundation of the garage excavated if the excavator for excavating the excavation pit is on the property anyway - this will save you additional costs later.

Start early with earthwork for the outdoor facilities

Purely practical aspects also speak for the early planning of the outdoor facilities. Do you have to terrace a slope? Filling up or replacing the floor? This is often only possible as long as the house is not yet standing and an excavator still has free access. You should therefore commission the civil engineer early, ideally shortly after the building permit has been issued. In order to get a complete picture of the outdoor area or the plot, the civil engineer needs further information in addition to the site plan. This includes, for example, a sectional drawing of the necessary excavation, a soil survey and information on whether the property is in a water protection area or is accessible for heavy trucks. Ideally, the commissioned architect is also the construction manager, takes care of the construction from A to Z and also coordinates the specialist companies. Attention: This is not the case with many prefabricated house manufacturers. In this case, the builders either have to do it themselves and organize the appointments or hire a dedicated site manager to do it.

The design of the garden

The design of the garden after building a house is a complete new beginning - at best, a house tree will remain from the old property or garden. Now you can make your garden dreams come true: Would you like a strictly formalistic-modern style with straight lines, Corten steel and concrete, or would you prefer a natural oasis with water, stone walls and lots of wood? Or should it be primarily a vegetable garden with vegetables and herbs? Think about how you want to use the garden predominantly.

If you are not yet sure what to do with your property in the first year, it is best to sow lupins everywhere first. They bloom beautifully, loosen the soil, which is mostly fully compacted by the construction machinery, to a depth of over two meters and enrich it with nitrogen.

Inspirations for garden design 3 pictures

Gartenteich als Ruhepunkt im Garten
Gartenteich als Ruhepunkt im Garten

A garden pond is a wonderful oasis and a resting point in your garden.

Photo: Florapress / FocusOnGarden / Jürgen Becker Photo gallery start inspirations for garden design

Image
Image

A garden pond is a wonderful oasis and a resting point in your garden.

Photo: Florapress / FocusOnGarden / Jürgen Becker

Image
Image

For many, the terrace is where they spend the most time.

Photo: Flora Press / FocusOnGarden / Jürgen Becker

Image
Image

The trend material corten steel can be easily integrated into the garden.

Photo: Gardenpicturestock / Elke Borkowski

Gartenteich als Ruhepunkt im Garten
Gartenteich als Ruhepunkt im Garten
Terrasse im Garten
Terrasse im Garten
Cortenstahl im Garten
Cortenstahl im Garten

Outdoor facilities costs

The resulting costs for the outdoor facilities depend on the individual circumstances of the garden and the materials used. For a single-family house, a total of 20, 000 euros can quickly be raised if you have everything done by specialist companies.

Your own work saves the hourly wages of specialist companies, which can amount to several thousand euros for the outdoor area. Possible own contributions are the complete lawn and bed plant as well as the construction of pergolas, fences or low garden walls, for which no structural engineer is necessary. In addition, all paving work on garden paths, driveways and terraces as well as the laying of foundations for large garden houses.

You can also get involved in the necessary preparatory work yourself and, for example, clear the property in front of the house: path with junk, bushes, old fences or dilapidated sheds. All work for which experts demand a lot of money, but which are also faster with their experience and equipment. For this work, do-it-yourselfers need at least a large trailer and a mini excavator.

Do not be blinded by the cost savings, however: If you make your own contribution to the garden, you will usually have to plan the weekends and quickly realize how time-consuming it can be - not to mention the back pain.

Thomas Hess